Case Study: Assortment of Hulcher Equipment Moves 170 Tons With PrecisionScopeAn aggregate company was ending its lease of a sand pit and needed to relocate its large industrial dredge to another pit approximately one mile away. They needed a company with the hardware capable of safely moving this 340,000 lb., 90’ x 20’ piece of equipment over land. SolutionHulcher Services was selected to move the industrial dredge based on its extensive experience with moving large pieces of equipment such as locomotives and rail cars. Hulcher deployed six Caterpillar® sidebooms, an excavator and two Caterpillar® 977 track loaders to complete the work. The excavators and track loaders started the project by digging a trench at the edge of the sand pit. Sidebooms brought in a platform to put beneath the dredge and placed that in the trench. Using the custom rear-mounted winches that Hulcher installs on their heavy equipment, the sidebooms and track loaders then pulled the dredge from the pit and into the trench, positioning it onto the platform. Once the dredge was secured to the platform, the sidebooms lifted the entire load and transported it to the new location. The six sidebooms ultimately hauled the industrial dredge more than a mile and positioned it for servicing and placement into the new pit. OutcomeThe entire process of creating the trench, loading the dredge and moving it to its new location was completed in one day, as planned. With its extensive fleet of heavy equipment Hulcher was able to mobilize all the equipment needed to move this 170-ton piece of equipment safely. The company was pleased with how this challenging project was performed and is now scheduling with Hulcher to do more dredge moves in this manner. Click here for more information about Hulcher's fleet of heavy equipment. |
|
More Case Studies from Hulcher Services:
Engineering Case Studies:- Case Study - Hulcher Clears Fire Damage For Bridge Repair, Performs Driftwood Removal From Bridge Piers
- Case Study - Air Excavation / Vacuum Truck
- Case Study - Railroad Crossing
- Case Study - Grade Stabilization
- Case Study - #20 Switch Change
- Case Study - #15 Switch Change
- Case Study - Pile Driver With Rail
- Case Study - Hulcher Pile Driver, Excavator Support Rail Gang on Bridge Stabilization
- Case Study - Pile Driver, Excavator and Hi-Rail Rotary Dump Truck Stabilize Bank at Bridge Headwall
- Case Study - Excavator and Vibratory Hammer Pile Driver Drive H-Beams for Sound Barrier Wall at Hump Yard
- Case Study - Large Undercutter Project
- Case Study - Hulcher Installs Gage Ties for Railroad Tie Gangs
- Case Study - Hulcher Excavator, Wheel Loader and Backhoe Perform Bridge Maintenance
- Project Snapshot - Hulcher Excavator and Crew Perform Load Adjustment of Steel Pipes
- Project Snapshot - Hulcher Forklift and Crew Perform Load Adjustment on Load of Roofing Tiles
- Project Snapshot - Telehandler and Conveyor Perform Load Reduction of Alfalfa Pellets
- Case Study - Hulcher Services Performs Environmental Remediation of Arsenic Contamination at Rail Yard for the Railroad
- Case Study - Hulcher Remediates Pond at Chemical Manufacturing Facility
- Case Study - Emergency Response and Remediation Resolves Major Hazardous Material Spill
- Case Study - Hulcher Services Rehabilitates Containment System for Two Million-Gallon Above Ground Storage Tanks ASTs
- Case Study: Hulcher Services Removes Three Diesel and Lube Oil Above-ground Storage Tanks (ASTs) From Railyard
- Case Study: Hulcher Services Remediates 13,500 Tons of Contaminated Soil at Former Salvage Yard
- Case Study: Hi-Rail Vacuum Truck Cleans Locomotive Service Terminal Work Bay
- Case Study: Hulcher Services Remediates Six 3,000-Gallon Underground Storage Tanks (USTs)
- Case Study - Hulcher Crews Perform Tie Down Work on Military Heavy Equipment
- Project Snapshot - Hulcher Performs Loading and Tie Down of Hopper Cars
- Project Snapshot - Hulcher Performs Loading and Tie Down of Three Damaged Locomotives
- Case Study: Hulcher Services Provides Disaster Response for Railroad's Tornado Damage
- Case Study: Hulcher Provides Disaster Response to Simultaneous Major Flood Events
- Case Study - Demolition
- Project Snapshot - Hulcher Dozer Clears Right of Way Vegetation
- Project Snapshot - Grapple Truck and Backhoe Break Down Track Panels
- Case Study - Forklift Ramp and Parking Lot Asphalt
- Case Study - Hulcher Services Grades Five-Acre Lot and Creates Asphalt Pads, Roads and Pathways at Rail Yard
- Project Snapshot - Hulcher Crew Performs Asphalt Work at Rail Yard
- Project Snapshot - Hulcher Clears Vegetation Canopy Over Right-Of-Way
- Case Study - Hulcher Services Demolishes Signals Bridge, Cantilever and Signals Tower for Positive Train Control (PTC) Project