Case Study: Hulcher Excavator, Wheel Loader and Backhoe Perform Bridge MaintenanceScopeThe railroad needed to perform major refurbishing on a 300-foot bridge, as part of its normal maintenance program. This bridge was located on an active stretch of right-of-way so the maintenance had to be completed as quickly as possible to minimize schedule disruptions. The railroad needed a contractor with the equipment and expertise to remove the old rail, ballast and support ties and replace them with new materials within the tight time constraints of their traffic schedule. SolutionHulcher deployed a wheel loader, backhoe and excavator to perform the maintenance work. The excavator and backhoe removed the old track, ballast and bundles of connected ties (known as “tubs”) that provided the horizontal support for the bridge’s tracks. The wheel loader followed this work to bring in new tubs and place them on the bridge. This overlapping of steps expedited the process. Once the new tubs were in place, the railroad placed tote boards on the bridge. Hulcher crews then placed the replacement rail and dropped in ballast rock to complete the work. Hulcher crews returned the next day with a wheel loader and dump trucks to separate and load the old materials for proper disposal. OutcomeCompleting the project within the allotted schedule window was crucial to ensure railroad operations were not affected. Because Hulcher’s experienced crew members overlapped the steps to remove and replace the tubs, they completed the maintenance tasks in 14 hours - a half-day early. The bridge was operational the next day when crews returned to clean up the old tubs and ballast. Click here for a printable version of this case study Follow these links for more information about: |
|
More Case Studies from Hulcher Services:
Engineering Case Studies:- Case Study - Hulcher Clears Fire Damage For Bridge Repair, Performs Driftwood Removal From Bridge Piers
- Case Study - Air Excavation / Vacuum Truck
- Case Study - Railroad Crossing
- Case Study - Grade Stabilization
- Case Study - #20 Switch Change
- Case Study - #15 Switch Change
- Case Study - Pile Driver With Rail
- Case Study - Hulcher Pile Driver, Excavator Support Rail Gang on Bridge Stabilization
- Case Study - Pile Driver, Excavator and Hi-Rail Rotary Dump Truck Stabilize Bank at Bridge Headwall
- Case Study - Excavator and Vibratory Hammer Pile Driver Drive H-Beams for Sound Barrier Wall at Hump Yard
- Case Study - Large Undercutter Project
- Case Study - Hulcher Installs Gage Ties for Railroad Tie Gangs
- Project Snapshot - Hulcher Excavator and Crew Perform Load Adjustment of Steel Pipes
- Project Snapshot - Hulcher Forklift and Crew Perform Load Adjustment on Load of Roofing Tiles
- Project Snapshot - Telehandler and Conveyor Perform Load Reduction of Alfalfa Pellets
- Case Study - Hulcher Services Performs Environmental Remediation of Arsenic Contamination at Rail Yard for the Railroad
- Case Study - Hulcher Remediates Pond at Chemical Manufacturing Facility
- Case Study - Emergency Response and Remediation Resolves Major Hazardous Material Spill
- Case Study - Hulcher Services Rehabilitates Containment System for Two Million-Gallon Above Ground Storage Tanks ASTs
- Case Study: Hulcher Services Removes Three Diesel and Lube Oil Above-ground Storage Tanks (ASTs) From Railyard
- Case Study: Hulcher Services Remediates 13,500 Tons of Contaminated Soil at Former Salvage Yard
- Case Study: Hi-Rail Vacuum Truck Cleans Locomotive Service Terminal Work Bay
- Case Study: Hulcher Services Remediates Six 3,000-Gallon Underground Storage Tanks (USTs)
- Case Study - Hulcher Crews Perform Tie Down Work on Military Heavy Equipment
- Project Snapshot - Hulcher Performs Loading and Tie Down of Hopper Cars
- Project Snapshot - Hulcher Performs Loading and Tie Down of Three Damaged Locomotives
- Case Study: Hulcher Services Provides Disaster Response for Railroad's Tornado Damage
- Case Study: Hulcher Provides Disaster Response to Simultaneous Major Flood Events
- Case Study - Demolition
- Case Study - Assortment of Hulcher Equipment Moves 170 Tons Industrial Dredge
- Project Snapshot - Hulcher Dozer Clears Right of Way Vegetation
- Project Snapshot - Grapple Truck and Backhoe Break Down Track Panels
- Case Study - Forklift Ramp and Parking Lot Asphalt
- Case Study - Hulcher Services Grades Five-Acre Lot and Creates Asphalt Pads, Roads and Pathways at Rail Yard
- Project Snapshot - Hulcher Crew Performs Asphalt Work at Rail Yard
- Project Snapshot - Hulcher Clears Vegetation Canopy Over Right-Of-Way
- Case Study - Hulcher Services Demolishes Signals Bridge, Cantilever and Signals Tower for Positive Train Control (PTC) Project