PROJECT SUMMARY:

Removed damaged #15 switch and installed new switch at rail yard.

EXPERT SERVICE:

Working closely with the railroad, Hulcher completed the project in under six hours with minimal impact to the yard’s operations.

AN ESTABLISHED RELATIONSHIP:

Hulcher has a maintenance-of-way agreement with the railroad; this sustained relationship allows Hulcher to understand the yard’s specific needs.
 

More Information On This Project:

Associated Services:


Equipment Used:

Industries Hulcher Serves:

 

Printable Version of the #15 Switch Change  Case Study
Download Printable Version of the #15 Switch Change Case Study (PDF)

Hulcher Core Services Brochure
Download Core Services Brochure (PDF)

Hulcher Track Maintenance / Maintenance of Way / Engineering Services Brochure
Download Track Maintenance / Maintenance of Way / Engineering Services Brochure (PDF)

 


Hulcher is Close to You!

Click map to view our locations

Our Services:

Industries Served:

Connect With Hulcher

Follow Hulcher  

More About Hulcher