FOLLOW HULCHER            Home      Careers      Sitemap
 

KEY FACTS

PROJECT SUMMARY:

Stabilize hillside between right-of-way and highway.

RECYCLING RAIL:

Railroad wanted to use existing rail stock instead of H-beams or sheet pile.

INNOVATION:

Hulcher modified their pile driver to drive rail into the hillside.

RESULTS:

Hillside stabilized to improve train and motorist safety; railroad saved money and supported its green program by reusing old rail.
 

More Information On This Project:

Associated Services:


Equipment Used:

Industries Hulcher Serves:


Pile driver video
Video of the Pile Driver

Pile driver driving rail video
Video of the Pile Driver - Rail

Printable Version of the Pile Driver With Rail / Grade Stabilization Case Study
Download Printable Version of the Pile Driver With Rail / Grade Stabilization Case Study (PDF)

Hulcher Core Services Brochure
Download Core Services Brochure (PDF)

Hulcher Track Maintenance / Maintenance of Way / Engineering Services Brochure
Download Track Maintenance / Maintenance of Way / Engineering Services Brochure (PDF)

 



Hulcher is Close to You!

Click map to view our locations

Our Services:

Industries Served:

Connect With Hulcher

Follow Hulcher  

More About Hulcher