KEY FACTS

PROJECT SUMMARY:

Improve water drainage and stabilize land along right-of-way

DRAINAGE:

Engineered French drains and runoff systems to manage rainwater

STABILIZATION:

Cleaned debris from under tracks and restored stability by grading and excavating hills and terrain

RESULTS:

Improved safety; reduced 120 minutes of slow orders to under 10 minutes and increased train speeds from 10 mph up to 55 mph
 

More Information On This Project:

Associated Services:


Equipment Used:

Industries Hulcher Serves:


Off Track Undercutter video
Video of the Undercutter

Pile driver video
Video of the Pile Driver

Pile driver driving rail video
Video of the Pile Driver - Rail

Printable Version of the Grade Stabilization Case Study
Download Printable Version of the Grade Stabilization Case Study (PDF)

Hulcher Core Services Brochure
Download Core Services Brochure (PDF)

Hulcher Track Maintenance / Maintenance of Way / Engineering Services Brochure
Download Track Maintenance / Maintenance of Way / Engineering Services Brochure (PDF)

 



Hulcher is Close to You!

Click map to view our locations

Our Services:

Industries Served:

Connect With Hulcher

Follow Hulcher  

More About Hulcher