FOLLOW HULCHER            Home      Careers      Sitemap
 

KEY FACTS

PROJECT SUMMARY:

Remove arsenic contamination from action portion of a busy rail yard.

CONTAMINATION REMOVED:

Removed and disposed of 20,000 tons of soil and sub ballast and performed chemical stabilization.

RAILROAD EXPERTISE:

Knowledge and experience allowed operators to minimize disruptions.

SAVING MONEY:

Identified local source for ballast and saved railroad over $100,000.
 

More Information On This Project:

Associated Services:


Equipment Used:

Industries Hulcher Serves:


Printable Version of the Environmental Remediation at Rail Yard Project Case Study
Download Printable Version of the Environmental Remediation at Rail Yard Case Study (PDF)

Hulcher Environmental Statement of Qualifications (SOQ) Brochure
Download Hulcher Environmental Statement of Qualifications (SOQ) Brochure (PDF)

Hulcher Download Environmental Summary
Download Environmental Summary (PDF)

Printable Version of the Environmental Remediation Flyer
Download Printable Version of the Environmental Remediation Flyer (PDF)

Printable Version of the Undercutter Flyer
Download Printable Version of the Undercutter Flyer (PDF)

hi-rail rotary dump truck
Download Printable Version of the Hi-Rail Rotary Dump Truck Flyer (PDF)

Printable Version of the Railroad Backhoe Services Flyer
Download Printable Version of the Railroad Backhoe Services Flyer (PDF)




Hulcher is Close to You!

Click map to view our locations

Our Services:

Industries Served:

Connect With Hulcher

Follow Hulcher  

More About Hulcher