Scope:
A load of steel pipes had shifted during transit and needed to be reloaded so it would be properly balanced. Hulcher Services deployed a Caterpillar® 325D excavator and crew.
Solution:
The excavator repositioned and restacked the pipes into a safe configuration. The crew then secured the pipes with the proper bindings, in accordance with AAR standards, including AAR Open Top Loading Rules. The project was completed successfully, on time and on budget.
Outcome:
Railroads and grain, coal, and industrial facilities across the country trust Hulcher’s experience to perform tie-down, transfer, load adjustment and load reduction projects like this each year.
Hulcher Excavator and Crew Perform Load Adjustment of Steel Pipes
A load of steel pipes had shifted during transit and needed to be reloaded so it would be properly balanced. Hulcher Services deployed a Caterpillar® 325D excavator and crew.
Hulcher Forklift and Crew Perform Load Adjustment on Load of Roofing Tiles
Eighteen pallets of roofing tiles on a center beam railcar shifted during transit, crushing their pallets and damaging the banding. Hulcher sent a crew of five personnel, a forklift, replacement pallets and a banding machine to remedy the problem.
Telehandler and Conveyor Perform Load Reduction of Alfalfa Pellets
A chronic problem for one Midwestern community was the old and worn-out railroad crossing in the center of town. The ride over the tracks was always a bumpy one and extremely hard on the vehicles that crossed it on a daily basis.