KEY FACTS

PROJECT SUMMARY:

Put down new asphalt on dock ramp and fix parking lot potholes.

AIR SPADE®:

The Air Spade® made short work of loose debris on the ramp surface.

TURNKEY SOLUTION:

Hulcher’s crew performed the entire project, providing a convenient turnkey solution to the railroad.

FAST RESULTS:

Resurfacing the ramp was completed in five hours
 